The FlexKote System

Renew the roof you already own.

An acrylic co-polymer coating applied over your existing roof — re-coatable, renewable, and installed without shutting the building down.

  1. 01

    Inspect & prep the existing roof

    We walk every square foot, core-test where needed, and document the failures. Then the roof is cleaned, wet insulation is replaced, drainage is corrected, and seams, curbs, flashings, and penetrations are reinforced with fabric and mastic. Prep is where a coating job is won or lost.

  2. 02

    Apply the FlexKote coating system

    A seamless acrylic co-polymer top coat is applied in coats over the prepared surface. It bonds to most existing roofs — modified bitumen, single-ply, built-up, metal — with no tear-off. Your building stays open, and the bright white finish reflects heat instead of absorbing it.

  3. 03

    Re-coat every renewal cycle

    Coatings weather; they don't fail catastrophically. At the renewal cycle we clean and re-coat the surface, restoring membrane thickness and starting a fresh warranty term. Do this on schedule and the roof simply keeps going.

What it means for the building

Coating versus replacement, plainly.

 FlexKote coatingFull replacement
Tear-offNone — coated in placeEntire roof removed
Building operationsStay open throughoutDisruption, noise, debris
Landfill wasteAlmost noneTons of old roofing
Future costRe-coat cycleReplace again in 15–20 years
WarrantyRenewable at each re-coatOne term, then it ends

The renewal side of this is worth its own page — read how warranties renew.